U.S. Boiler Company PVG5 Instruções de Operação

Consulte online ou descarregue Instruções de Operação para Aquecedores e fervedores de água U.S. Boiler Company PVG5. U.S. Boiler Company PVG5 Operating instructions Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 0
103997-06 - 1/14
As an ENERGY STAR
®
Partner, U.S. Boiler Company has determined that the PVG-3, PVG-4, PVG-5, PVG-6 and
PVG-7 meet the ENERGY STAR
®
guidelines for energy efciency established by the United States Environmental
Protection Agency (EPA).
Price - $5.00
9700609
INSTALLATION, OPERATING AND
SERVICE INSTRUCTIONS FOR
PVG
Gas - Fired Boiler
For service or repairs to boiler, call your heating contractor. When seeking information on boiler, provide
Boiler Model Number and Serial Number as shown on Rating Label.
Model Number
Boiler Serial Number Installation Date
Heating Contractor Phone Number
Address
Vista de página 0
1 2 3 4 5 6 ... 67 68

Resumo do Conteúdo

Página 1 - Gas - Fired Boiler

103997-06 - 1/14 As an ENERGY STAR® Partner, U.S. Boiler Company has determined that the PVG-3, PVG-4, PVG-5, PVG-6 and PVG-7 meet the ENERGY STAR® gu

Página 2

10Table 3: Vent System ComponentsVent System ComponentPart NumberEquivalent Feet of Pipe3” Dia. Pipe x 1 Ft 8116296U14” Dia. Pipe x 1 Ft 100176-013”

Página 3

11B. General Guidelines1. Vent system installation must be in accordance with National Fuel Gas Code, ANSI Z223.1/NFPA 54, Natural Gas and Propane I

Página 4

12g. Minimum 10 feet (2 m) horizontally from an operable opening in an adjacent building. This does not apply to vent terminals 2 feet (0.6 m) or mo

Página 5 - TABLE OF CONTENTS

13C. Install Vent Pipe, U.S. Boiler Gasketed Vent System.1. Procedure for Joining U.S. Boiler Gasketed Vent Pipe and Fittings. See Figure 3.a. Wip

Página 6 - Figure 2: Dimensions

14Figure 4: Horizontal – Vent InstallationIII. VENTING (continued)

Página 7 - I. PRE-INSTALLATION

15Figure 5: Horizontal – Vent TerminalConguration (3” or 4” Vent)Vertical Venting –1. See Figure 28 for Blower Vent Connector Assembly. Do not

Página 8 - II. UNPACK BOILER

16Figure 7: Attic OffsetFigure 6: Vertical Vent InstallationIII. VENTING (continued)

Página 9 - III. VENTING

17Figure 8: Vertical Vent TerminationUnited States: Extend Vent Piping to maintain minimum vertical (“X”) and minimum horizontal (“Y”) distance of t

Página 10 - III. VENTING (continued)

181. See Figure 28 for Blower Vent Connector Assembly. Do not exceed maximum vent lengths. Refer to Table 4.2. This installation will allow a maxi

Página 11

19A. Design and install boiler and system piping to prevent oxygen contamination of boiler water and frequent water additions.1. There are many poss

Página 12

2IMPORTANT INFORMATION - READ CAREFULLYNOTE: The equipment shall be installed in accordance with those installation regulations enforced in the area

Página 13

205. When constructing a piping tree to install LWCO select ttings (tees, elbows etc) and nipples to have the same size (NPT) as boiler supply conne

Página 14

21Figure 13: Recommended Piping for Combination Heating & Cooling(Refrigeration) SystemNOTICEU.S. Boiler recommends sizing the system circulator

Página 15

22IV. WATER PIPING AND TRIM (continued)bring the pH between 7 and 11.L. If it is required to perform a long term pressure test of the hydronic syste

Página 16

23Figure 14: Recommended Boiler Piping For Circulator Zoned Heating Systems IV. WATER PIPING AND TRIM (continued)

Página 17

24Figure 15: Recommended Water Piping for Zone Valve Zoned Heating SystemsIV. WATER PIPING AND TRIM (continued)

Página 18

25V. GAS PIPINGTable 5: Gas Ratings For materials or conditions other than those listed above, refer to National Fuel Gas Code, ANSI Z223.1 /NFPA54

Página 19 - IV. WATER PIPING AND TRIM

26Figure 16: Recommended Gas PipingTable 8: Equivalent Lengths of Standard Pipe Fittings & ValvesB. Connect boiler gas valve to gas supply syste

Página 20

27C. Pressure test. The boiler and its gas connection must be leak tested before placing boiler in operation.1. Protect boiler gas control valve. Fo

Página 21

28VI. ELECTRICALA. General. Install wiring and electrically ground boiler in accordance with authority having jurisdiction or, in the absence of suc

Página 22

29Figure 17: Wiring Connection DiagramVI. ELECTRICAL (continued)

Página 23

3Special Installation Requirements for MassachusettsA. For all side wall horizontally vented gas fueled equipment installed in every dwelling, buildi

Página 24

30Figure 18: Wiring Ladder DiagramVI. ELECTRICAL (continued)NOTICEAll wire, wire nuts, controls etc. are installer supplied unless otherwise noted.I

Página 25 - V. GAS PIPING

31Figure 19: Circulator Zoned System Wiring DiagramVI. ELECTRICAL (continued)

Página 26 - V. GAS PIPING (continued)

32Figure 20: Zone Valve Zoned System Wiring SchematicVI. ELECTRICAL (continued)

Página 27

33A. General Guidelines1. Read and follow all venting, combustion air, water piping, gas piping and electrical instructions contained in this manual

Página 28 - VI. ELECTRICAL

34Figure 21: Modular Boiler PipingVII. MODULAR INSTALLATION (continued)

Página 29 - VI. ELECTRICAL (continued)

35A. Verify that the venting, water piping, gas piping and electrical system are installed properly. Refer to installation instructions contained in

Página 30

36Figure 22: Operating InstructionsVIII. SYSTEM START-UP (continued)

Página 31

37H. Check pilot burner ame. See Figure 24. Flame should be steady, medium hard blue enveloping 3/8 to ½ inch of sensing probe.I. Check main burne

Página 32

38WARNINGFailure to properly adjust gas input rate will result in over ring or under ring of the appliance. Improper and unsafe boiler oper

Página 33 - VII. MODULAR INSTALLATION

39IX. OPERATIONA. Boiler Sequence of OperationNORMAL OPERATION1. The PVG Boilers are equipped with an Intelligent Hydronic Control (control). This

Página 34

4WARNINGThis boiler requires regular maintenance and service to operate safely. Follow the instructions contained in this manual.Improper installatio

Página 35 - VIII. SYSTEM START-UP

40Figure 26: Boiler DisplayIX. OPERATION (continued)The control display, along with Up ñ, Down ò, and “I” keys may be used to view boiler operating

Página 36

41IX. OPERATION (continued)E. CHANGING THE ADJUSTABLE PARAMETERS To adjust parameters such as High Limit Setpoint and High Limit Differential:1. A

Página 37

427. Domestic Hot Water (DHW) Terminal Function (dh_) The control allows conguration of the DHW Circulator output functionality to help the PVG inte

Página 38

43X. TROUBLESHOOTINGA. Before troubleshooting The following pages contain trouble shooting tables for use in diagnosing control problems. When us

Página 39 - IX. OPERATION

44X. TROUBLESHOOTING (continued)IQ Boiler Control Error Codes (when "Err" is ashing)DisplayStatus Boiler / Control Action(s)Blank Boiler a

Página 40 - IX. OPERATION (continued)

45X. TROUBLESHOOTING (continued)2. Circulator is On, But Boiler is OffDisplay / Status Recommended Corrective ActionSTA1CirculatorPre-purgeBurner off

Página 41

46X. TROUBLESHOOTING (continued)5. Circulator is On, Blower is On but Boiler Fails to Start Display / Status DescriptionSTA 10Retry / RecycleDelayT

Página 42

47X. TROUBLESHOOTING (continued)Display / StatusRecommended Corrective ActionStA 10Retry / Recycle DelayStA 13Soft Lockout1. No Spark a. Can yo

Página 43 - X. TROUBLESHOOTING

48XI. SERVICEDANGERThis boiler uses ammable gas, high voltage electricity, moving parts, and very hot water under high pressure. Assure that all ga

Página 44

49A. General. Inspection and service should be conducted annually. Turn off electrical power and gas supply while conducting service or maintenance. F

Página 45 - Display /

5TABLE OF CONTENTSFigure 1: Minimum Clearances to Combustibles I. Pre-Installation ...7 II. Unpack Boiler ...

Página 46

50Figure 27: Silicone Tubing AssemblyFigure 28: Blower Vent Connector Assembly5. Disconnect Wiring Harness from Blower Motor.6. Remove Canopy/Blow

Página 47 - Recommended Corrective Action

51Figure 29: Flue and Burner Cleanout, 1” BurnerXI. SERVICE (continued)

Página 48 - XI. SERVICE

52Table 16: Pilot Burner LocationFigure 30: Differential Pressure MeasurementTable 17: Differential Pressure Switch SettingsModel Main Burner with

Página 49 - XI. SERVICE (continued)

53XII. REPAIR PARTS All PVG Repair Parts may be obtained through your local U.S. Boiler Wholesale distributor. Should you require assistance in loc

Página 50

54XII. REPAIR PARTS (continued)

Página 51

55Key No.Description[Quantity] Part NumberPVG3 PVG4 PVG5 PVG6 PVG7 PVG8 PVG91. CASTING ASSEMBLY1 Section Assembly 61707031 61707041 61707051 6170706

Página 52

56XII. REPAIR PARTS (continued)

Página 53 - XII. REPAIR PARTS

57Key No.Description[Quantity] Part NumberPVG3 PVG4 PVG5 PVG6 PVG7 PVG8 PVG92. BASE ASSEMBLY2A Base Wrapper 71807031 71807041 71807051 71807061 7180

Página 54

58Key No.Description[Quantity] Part NumberPVG3 PVG4 PVG5 PVG6 PVG7 PVG8 PVG93. BASE ASSEMBLY3A Burner Cover (Natural Gas Only) 102033-03 102033-04 1

Página 55

59Key No.Description[Quantity] Part NumberPVG3 PVG4 PVG5 PVG6 PVG7 PVG8 PVG94. FAN/CANOPY ASSEMBLY4ACanopy Assembly - Sea Level 61107031 61107041 61

Página 56

6Figure 2: DimensionsPVG CONNECTION SIZES(DIMENSIONS IN INCHES)Model Supply Return Vent Relief ValvePVG31¼ NPT 1¼ NPT3¾ NPTPVG4PVG5PVG6PVG7PVG84PVG9PV

Página 57

60XII. REPAIR PARTS (continued)

Página 58

61Key No.Description[Quantity] Part NumberPVG3 PVG4 PVG5 PVG6 PVG7 PVG8 PVG95. BURNER ASSEMBLY5AGas Valve (Natural Gas), Honeywell VR8204P1171816602

Página 59

62Key No.Description[Quantity] Part NumberPVG3 PVG4 PVG5 PVG6 PVG7 PVG8 PVG96. CONTROL PANEL ASSEMBLY6ALimit Rated Temperature Sensor, 12”, Honeywe

Página 60

63Key No.Description[Quantity] Part NumberPVG3 PVG4 PVG5 PVG6 PVG7 PVG8 PVG97. JACKET PARTS7A Left Side Panel 604070027B Right Side Panel 604070017C

Página 61

64Key No.Description[Quantity] Part NumberPVG3 PVG4 PVG5 PVG6 PVG7 PVG8 PVG98. MISCELLANEOUS PARTS CARTON8A Water Manifold 806070018B Temperature/P

Página 62

65Figure NumberPage Number DescriptionFigure 1 5 Minimum Clearances to CombustiblesFigure 2 6 DimensionsSection III - Ven

Página 63

66TableNumberPage Number DescriptionSection III - VentingTable 1 9 Vent System OptionsTable 2 9 Vent System Components In

Página 64

67SERVICE RECORDDATE SERVICE PERFORMED

Página 65 - APPENDIX A - FIGURES

68U.S. Boiler Company, Inc.P.O. Box 3020Lancaster, PA 176041-888-432-8887www.usboiler.net

Página 66 - APPENDIX B - TABLES

7WARNINGIf you do not follow these instructions exactly, a re or explosion may result causing property damage or personal injury.DANGERDo not

Página 67 - SERVICE RECORD

8conned space. Use indoor air if two permanent openings communicate directly with additional space(s) of sufcient volume such that combined volume o

Página 68 - 1-888-432-8887

9III. VENTINGTable 1: Vent System OptionsTable 2: Vent System Components Included with BoilerWARNINGDo not use this boiler with galvanized, Type 30

Comentários a estes Manuais

Sem comentários