ROFSNOITCURTSNIECIVRES
ECNEDNEPEDNI
®
VP
RELIOBDERIF-SAG
For service or repairs to boiler, call hour heating contractor. When seeking information on boiler, provide
Boiler Model Number and Serial Number as shown on Rating Label.
Boiler Model Number
IN__PVNI
Boiler Serial Number Installation Date
Heating Contractor Phone Number
Address
9700609
Vista de página 0
1 2 3 4 5 6 ... 43 44

Resumo do Conteúdo

Página 1 - ECNEDNEPEDNI

103560-04 - 8/13Price - $5.00DNAGNITAREPO,NOITALLATSNIROFSNOITCURTSNIECIVRESECNEDNEPEDNI®VPRELIOBDERIF-SAGFor service or repairs to boiler, call hour

Página 2

10NOTICEThe gasketed vent system components pictured below in Figure A are being phased in and each vent component is interchangeable with the previou

Página 3

11doors, win dows, exhaust fans, replace dampers and any other gas burning appliance to their previous conditions of use.7. Any improper operation o

Página 4 - Table of Contents

12a. Clean the male end of each joint using an alcohol pad to remove any dirt and grease.b. Apply a continuous ¼ inch bead of sealant around male en

Página 5 - II. Unpack Boiler

13end of pipe is below locking band and rest against the end of the female pipe. Verify the factory-installed gasket is not dislodged or cut.d. Smoo

Página 6 - III. Steam Piping and Trim

14Figure 11: Vertical Vent InstallationFigure 10: Horizontal Vent TerminalV. Venting (continued)fromoutside.Secureoutsideangetowallwithnails

Página 7 - Figure 3: Trim Installation

15Figure 13: Attic OffsetFigure 12: Vertical Vent Tee InstallationFigure 14: Vertical Vent TerminationTable 9: Minimum Vent Height Above RoofRoof Pitc

Página 8 - IV. Gas Piping

16Figure 15: Wiring DiagramVI. ElectricalA. General Install wiring and ground boiler in accordance with requirements of authority having jurisdictio

Página 9 - IV. Gas Piping (continued)

17VII. System Start-upA. Safe operation and other performance criteria were met with gas manifold and control assembly provided onboilerwhenboile

Página 10 - V. Venting

18Table 11: Green LED Status CodesIgnition ModuleTerminal DesignationWiring Ladder Diagram Terminal NumberMV 1MV/PV 2PV 3GND 424V (GND) 524V 6SPARK 9

Página 11 - V. Venting (continued)

19a. Pilotamecurrentinmicroampscanbemeasured using any standard micro-ammeter by inserting the meter probes into the module holes labeled FL

Página 12

2Figure 2: Tapping LocationsTable 2: Purpose of TappingsTable 1: Dimensions and ClearancesThe following terms are used throughout this manual to bring

Página 13

20Honeywell Electronic Ignition Troubleshooting GuideFigure 18: Troubleshooting Guide"CALL FOR HEAT."POWER TOMODULE? (24 VNOMINAL)NOYES30 S

Página 14

21F. Check pilot burner ame. See Figure 19. Flame should be steady, medium hard blue enveloping 3/8 to ½ inch of sensing probe.Figure 19: Pilot Burn

Página 15

22Figure 21: Operating Instructionsi. Remove Main Burners per procedure in Section VIII: Service.ii. Removegasorices.Drillone(1)drillsizela

Página 16 - VI. Electrical

231. Fill boiler to normal waterline.2. Follow Operating Instructions to place boiler in operation. See Figure 21.3. Operate boiler with steam in e

Página 17 - VII. System Start-up

2415. Fill boiler to normal water line. Follow Operating Instructions to place boiler in operation. See Figure 21.16. Operate boiler for at least 3

Página 18 - Terminal Designation

25Important Product Safety InformationRefractory Ceramic Fiber ProductWarning:The Repair Parts list designates parts that contain refractory ceramic f

Página 19

26VIII. Service Instructions (continued)A. General Inspection and service should be conducted annually. Turn off electrical power and gas supply w

Página 20

27Figure 22: Cleaning Boiler Flue Passages14. Install Canopy/Blower Assembly. Tighten Carriage Bolts to fully compress Gasket.15. Install Blower Acc

Página 21

28Table 15: Minimum VacuumFigure 24: Inlet Fan Vacuum MeasurementFigure 25: L404F PressuretrolBoiler ModelMinimum VacuumIN3PVNI -0.40 inches w.c.IN4

Página 22

29SERVICE RECORDDATE SERVICE PERFORMED

Página 23 - N. Boil-out Boiler

3Figure 1: Elevation ViewsWARNINGThis boiler requires regular maintenance and service to operate safely. Follow the instructions contained in this ma

Página 24

30NONONOHOSE SECURELY CONNECTED TO CANOPY?YESYESVENT SYSTEM FREE OF OBSTRUCTIONS?YESREPLACE BLOWERCLEAR OBSTRUCTIONSNOREPLACE HOSECONNECT HOSE TO CANO

Página 25 - VIII. Service Instructions

31Troubleshooting Tree for Section VII, Step EWATERLINE ABOVE LOWEST PERMISSIBLE LEVEL?YESREPLACE BLOWER AFTER CHECKING FOR BROKEN WIRES AND LOOSE CON

Página 26 - B. Low water cutoff

32IX. Repair PartsKey No.Description[Quantity] Part NumberIN3PVNI IN4PVNI IN5PVNI IN6PVNI1. Section Assembly 61710033 61710043 61710053 617100632. C

Página 27 - F. Main Burners and Firebox

33Key No.Description[Quantity] Part NumberIN3PVNI IN4PVNI IN5PVNI IN6PVNI3. Base Assembly Group3A Base Tray [1] 71860391 [1] 71860491 [1] 71860591 [1

Página 28 - I. Housekeeping

34Key No.Description(Quantity) Part NumberIN3PVNI IN4PVNI IN5PVNI IN6PVNI4. Manifold and Main Burners4A Main Burner [2] 8236099 [4] 8236099 [6] 82360

Página 29 - SERVICE RECORD

35Key No.Description(Quantity) Part NumberIN3PVNI IN4PVNI IN5PVNI IN6PVNI5. Gas Train Group5A Pilot Assembly, Natural Gas, Honeywell Q3481B1206 [1] 1

Página 30

36Key No.Description(Quantity) Part NumberIN3PVNI IN4PVNI IN5PVNI IN6PVNI6. Jacket6A Left Side Panel [1] 604100236B Right Side Panel [1] 604100226C F

Página 31

37Key No.Description(Quantity) Part NumberIN3PVNI IN4PVNI IN5PVNI IN6PVNI7AMcDonnell & Miller PS-802 [1] 80160720Hydrolevel CG400-2090 [1] 8016072

Página 32 - IX. Repair Parts

38Key No.Description(Quantity) Part NumberIN3PVNI IN4PVNI IN5PVNI IN6PVNI10. Controls10A Ignition Module with Prepurge, Honeywell S8670E3003 [1] 1009

Página 33 - IX. Repair Parts (continued)

39Key No.Description(Quantity) Part NumberIN3PVNI IN4PVNI IN5PVNI IN6PVNI11. Gasketed Vent Accessory Carton (Includes 11A & 11B)6

Página 34

4I. Pre-InstallationF. Provide combustion and ventilation air in accordance with applicable provisions of local building codes, or National Fuel Gas

Página 35

40Appendix A - FiguresFigure NumberPage Number DescriptionFigure 1 3 Elevation ViewsFigure 2 2 Tapping LocationsSection I

Página 36

41Appendix B - TablesTableNumberPage Number DescriptionTable 1 2 Dimensions and ClearancesTable 2 2 Purpose of TappingsSe

Página 37

42SERVICE RECORDDATE SERVICE PERFORMED

Página 38

43SERVICE RECORDDATE SERVICE PERFORMED

Página 39

44U.S. Boiler Company, Inc.P.O. Box 3020Lancaster, PA 176041-888-432-8887www.usboiler.net

Página 40 - Appendix A - Figures

5rating of 1 perm or less with openings gasketed and sealed, and;b. Weather-stripping has been added on openable windows and doors, and;c. Caulking

Página 41 - Appendix B - Tables

6III. Steam Piping and TrimA. Design and install boiler and system piping to prevent oxygen contamination of boiler water. Oxygen contamination sour

Página 42

7Figure 4: Steam Piping, IN3PVNIFigure 3: Trim InstallationIII. Steam Piping and Trim (continued)

Página 43

8IV. Gas PipingA. Size gas piping. Design system to provide adequate gas supply to boiler. Consider these factors:1. Allowable pressure drop from po

Página 44 - 1-888-432-8887

9Table 4: Maximum Capacity of Schedule 40 Pipe in CFH of Natural Gas For Gas Pressures of 0.5 psig or LessTable 5: Fitting Equivalent LengthsFigure