10SECTION II: PACKAGED BOILER ASSEMBLY - TRIM & CONTROLSA. REMOVE CRATE.1. Remove all fasteners at crate skid.2. Lift outside container
11Figure 4A: Partial Front View - Burner Swing Door Mounted to Boiler - Fully Closed and SecuredStep 2. Loosen and remove right side latching hardwa
12Figure 4B: Top View - Burner Swing Door Mounted to Cast Iron Block Assembly (Jacket Removed for Clarity)
13(protruding from the bottom of the front section casting - see Figure 4A).Step 3. Use one hand to help hold door in position by lifting up on rear
145 thru 12) throughout the assembly sequence outlined below as it applies to your installation.1. Install supply manifold and aquastat control, refe
15Figure 6: Internal Junction Box and Wiring Harness DetailsMount the control box on the probe by aligning the keyhole slots with the probe mounting s
16from auxiliary limit control with harness socket connector. Push connectors together until snap, on side of connector, is locked in place.4. Insta
17Figure 9: Return Manifold and Relief Valve Assembly Details Place a wrench on the hex nut portion and tighten manifold until the return pipe orien
18these fi ttings, determine if drain valve is to be located on the left or right side. Tighten nipple and tee into 1-1/4" NPT lower rear tapping
19Step a. Install stainless steel baffl es provided in miscellaneous parts carton as follows, refer to Table 2 and Figure 11:• Model MPO84 - To ins
2IMPORTANT INFORMATION - READ CAREFULLY The following terms are used throughout this manual to bring attention to the presence of hazards of vario
20Step d. Remove three (3) 5/16-18 x 3/4 lg. cap screw from burner swing door used for mounting burner.Step e. Thread (1) 5/16-18 x 3/4 lg. cap scre
21 A. EVALUATE THE EXISTING WATER SYSTEM. Design a piping system and install boiler which will prevent oxygen contamination of boiler water and
22Figure 13A: Water Boiler Piping for Circulator Zoned Heating System - Supply Side Circulator
23Figure 13B: Preferred Water Boiler Piping for Zone Valve Zoned Heating System - Supply Side Circulator
24Figure 14: Recommended Piping for Combination Heating and Cooling (Refrigeration) System To perform a long term pressure test including the boiler
25SECTION IV: INDIRECT WATER HEATER PIPINGA. CONNECT ALLIANCE™ INDIRECT WATER HEATER PIPING as shown in Figures 15A and 15B.Figure 15A: All
26A. CHIMNEY VENTING 1. Chimney venting is an important part of a safe and effi cient oil fi red appliance system. Contact your local fi re and build
27Figure 16: Recommended Vent Pipe Arrangement and Chimney RequirementsFigure 17: Proper and Improper Locations of Draft Regulator
282. Type B Chimney Connector - a type B chimney connector can be used to transmit the fl ue gases provided fl ue gas temperature entering the chimney
29Figure 19: Optional Air Intake Piping Installation - Only Available with Beckett BurnerGNINRAWfosngisynaeraerehtfiselffabehtevomeRyenmihcroyenmihce
3 REGNADrosihtfoytinicivehtnisdiuqilrosropavelbammalfrehtoroenilosagesuroerotsTONOD.ecnailpparehtoynaGNINRAWytreporpesuacnacecnanetniamroecivres,noita
30c. Mount the vacuum relief valve into the tee and fasten with a screw and nut in collar tabs. To ensure proper operation, the gate must be level a
31A. GENERAL1. Install wiring and electrically ground boiler in accordance with requirements of the authority having jurisdiction, or in absence of
32Figure 20: Schematic Wiring Diagram, Standard Control Set w/Optional LWCO and/or High Limit Accessory KitA call for heat by the thermostat energize
33Figure 21: Single Pipe Oil LineSECTION VII: OIL PIPINGA. GENERAL1. Use fl exible oil line(s) so the burner swing door can be opened without di
34TABLE 3: TWO-STAGE UNITS (3450 RPM) - TWO PIPE SYSTEMSTABLE 4: SINGLE-STAGE UNITS (3450 RPM) - TWO PIPE SYST
35SECTION VIII: SYSTEM START-UPe. Open purge valve.f. Open shut-off valve in cold water supply piping located between the air scoop and expansion
36D. ADJUST CONTROL SETTINGS with burner service switch turned “ON” and room thermostat set 10° below room temperature.1. Adjustment and display mo
37E. ADJUST OIL BURNER BEFORE STARTING.1. CHECK BURNER AIR BAND, AIR SHUTTER AND HEAD SETTING (if applicable), readjust if necessary, see
38Figure 27: "L1/L2" and "V1" Head Electrode Positioning and Gun Setting (Beckett AFG)
39Figure 28: R7184 Terminals, LED and Reset Buttonsmoke tester and adjust air for minimum smoke (not to exceed #1) with a minimum of excess air. Mak
4GNINRAWepipynawercsnutonoD.erusserphgihrednuretawtohyrevsniatnocreliobsihTylevitisoptuohtiwreliobsihtfostnenopmocynatcennocsidottpmettaronsgnittifdna
40sehsalFsmhoniecnatsiseRlleCdaC1004nahtsseL2008nahtsseldna004nahteroM30061nahtsseldna008nahteroM40005nahtsseldna0061nahteroMTABLE 7: CAD CELL RESIST
414. CHECK LOW WATER CUT - OFF CONTROLTNATROPMIehtlitnudednettanureliobnurtonoD.detelpmocsierudecorpgniwollof ignitor, clean face of cad cell a
42Warning: This product contains refractory ceramic fi bers (RCF). RCF has been classifi ed as a possible human carcinogen. After this product is fi r
43SECTION IX: MAINTENANCE AND SERVICE INSTRUCTIONSA. MAINTENANCE OF LOW WATER CUT-OFF DEVICES (when installed) See Section XIV Appendix
44REGNADerusserporeztasireliobehttahterussAehtnepO.evlavfeilerehtgnivomererofeberusserplanretnillaeveilerotevlavytefasegrahcsidevlavytefaS.gnideecorpo
45SECTION X: BOILER CLEANINGA. CLEAN THE FLUEWAYS (See Figure 30).1. For access to the combustion chamber remove the two (2) 3/8" - 16 cap
46Figure 30: Cleaning of Boiler FluewaysGNINRAWytreporpsuoireS.noitidnocdoogniyenmihcdevorppanaotdetcennocebtsumreliobehTforoiretniehT.yenmihcetauqeda
47A. COMBUSTION1. NOZZLES — Although the nozzle is a relatively inexpensive device, its function is critical to the successful operation of the oil b
48b. Air leaking into oil line causing fl ame out.c. Defective nozzle causing fl ame to be erratic.d. Excessive airfl ow or draft causing fl ame to leav
49SERVICE RECORDDATE SERVICE PERFORMED
5STNETNOCFOELBAT.I...noitallatsnI-erP8.IIIV...pU-tratSmetsyS53.II...lortnoC&mi
50Bare Boiler Assembly
51metI.oNnoitpircseD.oNtraP48OPM741OPM981OPM132OPMYLBMESSARELIOBERAB.1A1denihcaM,noitceStnorF10-0600011111B1denihcaM,noitceSretneC10-160001---123C1den
52Bare Boiler Assembly
53metI.oNnoitpircseD.oNtraP48OPM741OPM981OPM132OPMYLBMESSARELIOBERAB.1)deunitnoC(S1)stekcoPsseL(noitalusnIrooDgniwSrenruB10-170001 1111)stekcoPhtiW(no
54Jacket Assembly
55metI.oNnoitpircseD.oNtraP48OPM741OPM981OPM132OPM.2YLBMESSATEKCAJA2noitalusnI/wylbmessAlenaPtnorFtekcaJ10-700001 1111B27390#ocyeH,elcatpeceRteltuOrew
56MPO84 Thru MPO231 Water Boilers - Trim and Controls
57METI.ONNOITPIRCSED.oNtraP48OPM741OPM981OPM132OPMSLORTNOCDNAMIRT-SRELIOBRETAW132OPMurhT48OPM.3A3:rofteksaG/wrenruBliOGFAttekceB2077BCB.oNcepS48OPM 10
58Beckett AFG Burner
59BECKETT OIL BURNER PART NOS. FOR MPO SERIES BOILERSNOTE: When ordering parts always give the serial and model numbers shown on the boiler and burne
6Figure 1: MPO 84 Thru MPO 231 Water Boiler
60 B. MPO LWCO To simplify installation, the MPO LWCO can be easily installed by removing the LWCO jumper inside the internal junction box a
61Figure A2: LWCO Location
62SERVICE RECORDDATE SERVICE PERFORMED
63relioBledoMrenruBtupnI)hpg(daeHepyT)gnittes(riArettuhS)gnittes(riAdnaB)gnittes(elzzoNpmuPerusserP)isp(.xorppAdeppihSOC2)%(elffaBnoitacoL)ssap(.xorpp
hydronics industry standards. These warranties will be inapplicable if the residential grade water boiler is used or operated over its rated c
7TABLE 1A: DIMENSIONAL DATA (SEE FIGURE 1)TABLE 1B: RATING DATArelioB.oNledoMsnoisnemiD1erugiFeeSretaW-tnetnoCsnollaGrefsnarTtaeH-aerAecafruS.tF.qS
8Figure 2: Minimum Installation Clearances To Combustible Materials (Inches)A. INSPECT SHIPMENT carefully for any signs of damage.1. All equipment