103536-02 - 7/13
Price - $5.00
DNAGNITAREPO,NOITALLATSNI
ROFSNOITCURTSNIECIVRES
maetSageM
RELIOBLIOSSAP-3
gnikeesnehW.reilppusliororotcartnocgnitaehruoyllac,reliobotsriaperroecivresroF
gnitaRnonwohssarebmuNlaireSdnarebmuNledoMrelioBedivorp,reliobnonoitamrofni
.reliobehtfopotnodetacollebaL
rebmuNledoMrelio
Br
ebmuNlaireSrelio
Be
taDnoitallatsnI
TSM
rotcartnoCgnitaeH rebmuNenohP
sserddA
9700609
As an ENERGY STAR
®
Partner,
U.S. Boiler Company
has determined that the
MST288, MST396, MST513
and MST629 meet the
ENERGY STAR
®
guidelines for Energy
efciency established by the
United States Environmental
Protection Agency (EPA).
Vista de página 0
1 2 3 4 5 6 ... 71 72

Resumo do Conteúdo

Página 1 - ™maetSageM

103536-02 - 7/13 Price - $5.00 DNAGNITAREPO,NOITALLATSNIROFSNOITCURTSNIECIVRES™maetS

Página 2

10A. CAST IRON SECTION ASSEMBLY TAPPINGS Refer to Table 3 "Purpose of Tappings and Bosses" and Figure 7. 1. All tappings have factory ins

Página 3

11Figure 4: Boiler Removal from SkidSECTION II: UNIT-PAK BOILER ASSEMBLY (continued)

Página 4 - TABLE OF CONTENTS

12Figure 5A: Partial Front View - Burner Swing Door Mounted to Boiler - Fully Closed and SecuredD. JACKET FRONT PANEL INSTALLATION. In order to

Página 5

13Figure 5B: Top View - Burner Swing Door Mounted to Cast Iron Block Assembly (Jacket Removed for Clarity)10. Inspect burner swing door insulation f

Página 6

1411. Upon inspection completion, lift door and place integral cast hinge pins into door mounting bracket slotted holes. Do not close and secure door

Página 7 - SECTION I: PRE-INSTALLATION

15Figure 6: Flueway Bafe Positioning/Orientationin Fluewaysueway on right side of boiler, hold bafe with word "Right" readable at the to

Página 8

16Figure 7: Purpose of Tappings and BossesTABLE 3: PURPOSE OF TAPPINGS & BOSSESTapping Location Size, NPT Boss Location Thread Size UNCSteam Boi

Página 9

177. Secure panel bottom to studs with acorn nuts hand tight.8. Align upper panel attachment holes with smokebox upper attachment bosses and install

Página 10

189. Place the panel between side panels upper inside anges and slide it forward, until top panel front ange U-bend locks over front panel top ang

Página 11

19Figure 9: Float-Type LWCO and Pressure Limit InstallationSECTION II: UNIT-PAK BOILER ASSEMBLY (continued)

Página 12

2IMPORTANT INFORMATION - READ CAREFULLY The following terms are used throughout this manual to bring attention to the presence of hazards of vario

Página 13

204. Pick-up the LWCO harness Molex end and feed it into the enclosure, thru external electrical enclosure top ange front left 7/8” hole; then, snap

Página 14

21Figure 10: Oil Burner Installation (Beckett Burner Shown)3. Thread safety valve into the ¾” NPT black coupling. Pipe the safety valve discharge as

Página 15

22g. Align holes and install two (2) remaining cap screws. Level burner and fully tighten all three (3) screws.h. Plug burner power cord into power

Página 16 - With Heater

23Figure 11D: Turbulator SettingFigure 11E: Pump Connections and Port IdenticationWARNING: Do not operate a single line system with the by-pass

Página 17

24 A. EVALUATE THE EXISTING STEAM SYSTEM. The single most important factor in determining the expected life cycle of a steam boiler, is the amou

Página 18

25Figure 12: Recommended Boiler Piping for Gravity Return Steam BoilerSECTION III: STEAM BOILER PIPING & TRIM (continued)

Página 19

26SECTION IV: TANKLESS & INDIRECT WATER HEATER PIPINGA. CONNECT TANKLESS HEATER PIPING as shown in Figure 13. See Table 4 for Tankl

Página 20

27TABLE 4: TANKLESS HEATER DATA: Figure 13: Schematic Tankless Water Heater PipingBoiler Model Heater No.Heater Rating (GPM)Pressure Drop thru Heate

Página 21

28Figure 14: Alliance SL™ Water Heater Piping with MegaSteam™ BoilerB. CONNECT ALLIANCE SL™ INDIRECT WATER HEATER PIPING as shown in Figure 14.

Página 22

29A. CHIMNEY VENTING 1. Chimney venting is an important part of a safe and efcient oil red appliance system. Contact your local re and buildin

Página 23

3DANGERDO NOT store or use gasoline or other ammable vapors or liquids in the vicinity of this or any other appliance. WARNINGImp

Página 24

30Figure 15: Recommended Vent Pipe Arrangement and Chimney RequirementsFigure 16: Proper and Improper Locations of Draft RegulatorSECTION V: VENTIN

Página 25

312. Type B Chimney Connector - a type B chimney connector can be used to transmit the ue gases provided ue gas temperature entering the chimney co

Página 26

32a minimum, remove the bafes to increase the stack temperature. See Tables 7 thru 7B for temperature differential (∆T) with bafes IN and OUT. In

Página 27

33A. GENERAL1. Install wiring and electrically ground boiler in accordance with requirements of the authority having jurisdiction, or in absence of

Página 28

34Figure 18: Wiring Diagram, Hydrolevel CG450 Probe LWCOSECTION VI: ELECTRICAL (continued)(SEE FIGURE 19 FOR SCHEMATIC WIRING DIAGRAM OF APPROPRIAT

Página 29

35Figure 18A: Wiring Diagram, McDonnell & Miller PS-801 Probe LWCOSECTION VI: ELECTRICAL (continued)(SEE FIGURE 19 FOR SCHEMATIC WIRING DIAGRAM

Página 30

36Figure 18B: Wiring Diagram, McDonnell & Miller #67 Float LWCOSECTION VI: ELECTRICAL (continued)(SEE FIGURE 19 FOR SCHEMATIC WIRING DIAGRAM OF

Página 31

37SECTION VI: ELECTRICAL (continued)Figure 19: Wiring Diagram, All Burner Options with Various Oil Primary Controls

Página 32

38BOILER SEQUENCE OF OPERATION WITH PROBE LWCO (See Figure 18)When the thermostat calls for heat, it energizes the R8285C Control Center relay w

Página 33 - SECTION VI: ELECTRICAL

39Figure 21: Single Pipe Oil LineSECTION VII: OIL PIPINGA. GENERAL1. Use exible oil line(s) so the burner swing door can be opened without dis

Página 34 - CONTROL OPTION)

4WARNINGThis boiler contains very hot water under high pressure. Do not unscrew any pipe ttings nor attempt to disconnect any components of this boi

Página 35

40Figure 22: Two Pipe Oil LinesC. TWO PIPE OIL LINES1. For two piped systems, where more lift is required, the two-stage fuel unit is recommende

Página 36

41SECTION VIII: SYSTEM START-UP1. SET ROOM THERMOSTAT about 10° above room temperature.2. PRESS RED RESET BUTTON on front of burner cover,

Página 37

425. Adjust oil pressure.a. When checking a fuel unit's operating pressure, a reliable pressure gauge may be installed in either the bleeder po

Página 38 - Jumper 1-3 H-C

43Figure 24: "L1" and "V1" Head Electrode Positioning and Gun Setting (Beckett AFG)SECTION VIII: SYSTEM START-UP (continued)

Página 39 - SECTION VII: OIL PIPING

442. IF NOZZLE CONTINUES TO DRIP, repeat Paragraph H, No. 1. If this does not stop the dripping, remove cut-off valve and seat, and wipe both w

Página 40

45Figure 26: Cad Cell LocationSECTION VIII: SYSTEM START-UP (continued)c. Simulate Ignition or Flame Failure:• Follow procedure to turn on burner

Página 41

46Important Product Safety InformationRefractory Ceramic Fiber ProductWarning:The Repair Parts list designates parts that contain refractory ceramic f

Página 42

47SECTION IX: MAINTENANCE AND SERVICE INSTRUCTIONSA. MAINTENANCE OF LOW WATER CUT-OFF DEVICESWARNINGProbe and oat type low water cu

Página 43

48 Operate the boiler with steam in the entire system for a few days allowing the condensate to return to the boiler. If the condensate can temporari

Página 44

49open gate valve in Hartford Loop, then repeat Step 1 above.e. Make pH or Alkalinity Test. After boiler and system have been cleaned and relled as

Página 45

5Figure 1: MST288 Thru MST629 Steam Boiler with and without Tankless Heater (Beckett Burner Shown)

Página 46

50SECTION X: BOILER CLEANINGA. CLEAN THE FLUEWAYS (See Figure 27).1. For access to the combustion chamber remove the two (2) 3/8" - 16 cap

Página 47

51Figure 27: Cleaning Boiler Flueways and Combustion Chamber SurfacesWARNINGThe boiler must be connected to an approved chimney in good condition. Se

Página 48

52A. COMBUSTION1. NOZZLES — Although the nozzle is a relatively inexpensive device, its function is critical to the successful operation of the oil

Página 49 - IMPORTANT

53d. Excessive airow or draft causing ame to leave burner head.e. Excessive back pressure causing ame to be erratic.3. Control locks out after T

Página 50 - SECTION X: BOILER CLEANING

54SECTION XII: REPAIR PARTSAll MegaSteam™ Boiler Repair Parts may be obtained through your local U.S. Boiler Company Wholesale distributor. Should

Página 51

55Item No.Description Part No. MST288 MST396 MST513 MST6291. BARE BOILER ASSEMBLY1ACast Iron Block Assembly - 3 Section (Non Heater) 100567-03 1 1 --

Página 52

56Bare Boiler AssemblySECTION XII: REPAIR PARTS (continued)

Página 53

57Item No.Description Part No. MST288 MST396 MST513 MST6291. BARE BOILER ASSEMBLY (Continued)1KBurner Swing Door Insulation (Less Pockets) 100039-01

Página 54 - SECTION XII: REPAIR PARTS

58Jacket AssemblySECTION XII: REPAIR PARTS (continued)

Página 55 - 1. BARE BOILER ASSEMBLY

59Item No.Description Part No. MST288 MST396 MST513 MST6292. JACKET ASSEMBLY2A Jacket Front Panel Assembly w/Insulation 100575-01 1 1 1 12B Power Out

Página 56 - Bare Boiler Assembly

6TABLE 1A: DIMENSIONAL DATA (SEE FIGURE 1)TABLE 1B: RATING DATABoiler Model No.Dimensions (See Figure 1)Water Content (To Normal Water Line) - Gall

Página 57

60MST288 Thru MST629 Steam Boilers - Trim and ControlsSECTION XII: REPAIR PARTS (continued)

Página 58 - Jacket Assembly

61Item No.Description Part No. MST288 MST396 MST513 MST6293. MST - TRIM AND CONTROLS3A6" RC-STD Draft Regulator 8116288 1 1 1 ---7" RC-STD

Página 59 - 2. JACKET ASSEMBLY

62Beckett AFG BurnerSECTION XII: REPAIR PARTS (continued)

Página 60

63BECKETT OIL BURNER PART NOS. FOR MEGASTEAM™ SERIES BOILERSNOTE: When ordering parts always give the serial and model numbers shown on the boiler an

Página 61 - 3. MST - TRIM AND CONTROLS

64NOTE: When ordering parts always give the serial and model numbers shown on the boiler and burner. Refer to Models F3 & F5 Installation Manua

Página 62 - Beckett AFG Burner

65TABLE 7: BECKETT AFG BURNER SPECIFICATIONSBoiler ModelBurner Input (gph)Head Type (setting)Air Shutter (setting)Air Band (setting) NozzlePump Press

Página 63

66Boiler ModelBurner Input (GPH)Burner ModelNozzleHead SettingAir SettingPump Pressure (PSI)Air Tube TypeInsertion Depth (Inch)Approx. Shipped CO2 (%)

Página 64 - MEGASTEAM SERIES BOILERS

67APPENDIX A - FIGURESFigure NumberPage Number DescriptionFigure 1 5 MST288 Thru MST629 Steam Boiler with and without Tan

Página 65

68APPENDIX A - FIGURES (continued)Figure NumberPage Number DescriptionSection VIII - System Start-UpFigure 23 42 Adjustin

Página 66

69APPENDIX B - TABLESTableNumberPage Number DescriptionTable 1A 6 Dimensional Data (See Figure 1)Table 1B 6 Rating DataSe

Página 67 - APPENDIX A - FIGURES

7Figure 2: Minimum Installation Clearances To Combustible Materials (Inches)A. INSPECT SHIPMENT carefully for any signs of damage.1. All equipment

Página 68 - Section XII - Repair Parts

70SERVICE RECORDDATE SERVICE PERFORMED

Página 69 - APPENDIX B - TABLES

71SERVICE RECORDDATE SERVICE PERFORMED

Página 70 - SERVICE RECORD

72U.S. Boiler Company, Inc.P.O. Box 3020Lancaster, PA 176041-888-432-8887www.usboiler.net

Página 71

8NOTICEClearance to venting is for single wall vent pipe. If Type L vent is used, clearance may be reduced to the minimum required by the vent pipe m

Página 72 - 1-888-432-8887

9SECTION II: UNIT-PAK BOILER ASSEMBLYMegaSteam™ Unit-Pak Boiler Assembly ShipmentContent Check List (see Figure 3)1. ___ Cast Iron Section/Burner

Comentários a estes Manuais

Sem comentários